FIELD BRIEF · THE BOTTLENECK
Authorization After an Acquisition
The permissions merge is usually what holds up the integration. A relationship-based layer doesn't merge the two systems; it lets you stop waiting for the merge to give people correct access.
Also available as a four-page PDF.
Day one after close, nearly every integration milestone, whether a shared customer view, one support queue, joint reporting or a combined data room, reduces to a question neither system can answer alone: can this person see this thing?
Two paths are usually on the table. Re-platform: pick a surviving system, rebuild the other inside it, and deliver all the value at the end of a 12 to 18 month program. Bilateral sync: wire the two directories and applications together with group mappings, ship in weeks, then watch the mappings drift until nobody can say with confidence who has access to what. The first is slow, the second is unauditable, and both put the authorization model on the critical path.
The third option is to lift the decision out of both applications while leaving both applications where they are.
The shape of it: one relationship graph, two namespaces
Both companies' permission models live in SpiceDB side by side, each in its own namespace and unchanged. Both applications keep their own storage, their own interface and their own release cycle. What moves is the permission decision.
parentco/report:fy27-pipeline#viewer@parentco/group:rev-ops#member
acquiredco/deal:1138#owner@acquiredco/team:field-eng#member
# the merger, as one write
acquiredco/deal:1138#viewer@parentco/group:rev-ops#member
Granting the ParentCo revenue team access to an AcquiredCo deal is a single relationship write, not a schema migration on either side. A check such as can Alice view acquiredco/deal:1138? is allowed through parentco/group:rev-ops, and running the legacy check in parallel shows the two agree before anyone cuts over.
What the relationship layer actually buys
Two permission models can coexist
RBAC, per-object ACLs and tenant scoping are all expressible in a Zanzibar-style schema. You port each side roughly as-is into its own namespace, run them side by side, and converge the model later as a schema change, not as a re-platform.
Cross-company access becomes data
"Give the acquired field team read access to ParentCo accounts" is a relationship written at runtime and reversible in one call. There is no bidirectional group sync to build, and no drift between two copies of the truth.
Cutover is testable before it's real
Backfill both systems' relationships, run checks against SpiceDB in parallel with the existing logic, and compare the answers under production traffic. You cut over one application at a time, once the comparison is clean, which is a far easier ask of a security team than a flag day.
The divestiture case is the same machinery
If part of the combined business is later carved out, separating a subgraph of relationships is tractable. Unpicking permissions that were fused into two applications' role tables generally is not.
How the work sequences
| Phase | What happens | Who leads |
|---|---|---|
| 0. Reconcile identity | One stable identifier per person across both directories. This has to land first, and it is not something an authorization layer can do for you. | Your identity team |
| 1. Recover the real models | Extract the effective permissions from each side, including the rules hidden in SQL joins and application code. This is the archaeology, and it is where these projects usually slip. | Joint |
| 2. One schema, two namespaces | Both models expressed in SpiceDB without changing either one's meaning, plus the specific cross-company grants the integration plan calls for. | SpiceDB specialists |
| 3. Backfill and shadow-read | Import existing relationships, then run SpiceDB checks alongside the live authorization path and compare every answer. Nothing user-visible changes. | Joint |
| 4. Cut over, one application at a time | Each service switches to SpiceDB as its source of truth once its comparison is clean. Cross-company access can be granted from this point without waiting for the rest of the integration. | Your teams |
The two models, side by side
A single schema holds both companies' definitions. The only new construct is the one that spans them:
// both sides keep their own shapes; the prefix keeps them apart
definition user {}
definition parentco/group {
relation member: user
}
definition acquiredco/team {
relation member: user
}
definition acquiredco/deal {
relation owner: acquiredco/team#member
// the merger, expressed once, in the schema
relation viewer: user | acquiredco/team#member | parentco/group#member
permission view = viewer + owner
}
Illustrative schema, simplified for the brief. Real models carry inheritance, tenancy and exclusions.
What this does not solve
- Identity reconciliation. SpiceDB needs a stable subject identifier. Deduplicating people across two identity providers, federating single sign-on and retiring one directory remain your work, and they gate everything else.
- Resource identity. If the same customer exists as a record in both CRMs, that duplication has to be resolved before relationships about it mean anything.
- Discovering the current model. Nothing reads a legacy application and tells you what its permissions actually are. Expect manual archaeology in phase 1.
- Deciding who should have access. Post-close entitlement policy is a governance and compliance decision. This layer enforces and evidences it; it does not make it.
- Regulated separation obligations. Where a deal carries hold-separate or clean-team conditions, treat the model as one input to your counsel's review, not as a compliance control on its own.
What we'd need to scope it
- Are you pre-close and planning, or already mid-integration with a target date?
- How many applications on each side make their own authorization decisions today?
- Is there one identity provider yet, or is that still in flight?
- What is the first cross-company access that has to work, and who is waiting on it?
- Which side's permission model, if either, is intended to survive?